The biggest job that we undertook was replacing the bathroom. For some months we had no bath and had to go to a nearby relative to have a shower. By December 2007 we had the basics of a sink, toilet and bath, but there was still a huge amount of work to be done on the tiling. The new layout was very different from the old one. The old bath ran from side to side in front of the window which made it very difficult to raise or lower the window blind. The toilet was next to the old bath on the same side as the new one and the sink where the head of the new bath now stands.